Use the link cable of JDM to prepare the master and finish it all. After testing sid 1 i connect this cable to slaves 1 by 1? And repeat the procedure (according to the steps in the step by step guide)
Sorry if i sound confusing
p.s. the cores j10 only have 4 wires connected right?
are these questions or conclusions? Of course, if you haven’t programmed the bootloader into the slaves, it’s time to do it now. And please don’t forget to set the ID of the slaves to 1, 2 and 3!